Starting material selection that fails ICH Q11 became a major deficiency in May 2026. That means no supplement request and no second chance. The reviewer rejects the application.
Review standards for chemical generic APIs have tightened, and files keep failing on the same handful of things. Below is a working map of where reviewers concentrate, what they want to see, and which arguments reliably fall apart. If you have an API program in development or heading into submission, go through this now rather than after a deficiency letter shows up.
What actually matters
- Justify your starting material against ICH Q11 one principle at a time, and weigh all of them together. Since May 2026, a failed justification goes straight to rejection.
- Buying a crude API and purifying it, or doing a one-step salt formation from a marketed free acid/base, will not be accepted. Two narrow exceptions: the API is inorganic, or the free acid/base is itself an approved API.
- Every impurity limit needs a basis. Wide limits on thin data, and specifications with no related substances test, come up constantly.
- Elemental impurities run on a 30% rule. Above 30% of the acceptable concentration limit, write it into the specification. Below it, you may have an argument for leaving it out.
- Structure elucidation gaps (unexplained elemental analysis deviation, thermal data from one batch, no proof of batch-to-batch form consistency) can end the review on their own.
- Complex APIs belong with the drug product filing, not standing alone.
Start from the finished product, not the molecule
Define the target from the outside in before you make a single batch. Investigate the reference product’s dosage form, route of administration, and the API critical quality attributes that follow from it. The maximum daily dose on the reference label then sets what your process and quality package have to deliver.
This step gets skipped more than it should. Teams characterize the molecule, build a process around it, and find out later that the reference label changed the dosing, or that the intended route of administration carries a tighter elemental impurity profile than the one they designed against. When the reference label changes indications or dosage, the knock-on effects are concrete: different limits for single impurities, mutagenic impurities, elemental impurities, and residual solvents. A change in treatment duration means the mutagenic impurity work gets redone from the beginning.
1. Starting materials: where ICH Q11 stopped being negotiable
Reviewers judge starting material selection against ICH Q11 and its question-and-answer document. What they do not want is a filing that quotes whichever principle happens to support the choice already made. You go through the principles one at a time, state whether the proposed material complies with each, and then weigh the whole picture.
The questions your justification has to answer:
- How many synthetic steps sit between the proposed starting material and the API, and do those steps actually purge anything?
- Is the material well-defined, isolable, stable, and of known structure?
- Is it a genuine commodity chemical with more than one supplier, or a custom intermediate made to your specification?
- Can you characterize its impurity profile, and do any of those impurities survive into the API?
- Do the steps after it carry real in-process controls and purification?
- Can you show control of the process from the starting material onward?
The shortcut that stopped working. Purifying a crude API bought on the open market, or running a one-step salt formation from a purchased free acid/base and then purifying, will not be accepted unless you document the manufacturer’s process and in-process controls for that crude material or free acid/base in full. Two narrow exceptions:
| Route | When it is acceptable |
| One-step purification | The API is an inorganic compound (magnesium sulfate, sodium sulfate, and similar) |
| One-step salt formation | The marketed free acid or base is itself an approved API |
A finding worth reading twice. One API was made in a single reaction step to a crude product, then purified. The in-house specification for the starting material controlled assay only, with no related substances test at all. Both the choice of starting material and its control were found seriously deficient. The reasoning was straightforward: quality has to be controlled from the source onward, and a specification that only asks “how much of the right thing is in here?” does not do that.
Extending the route while you are responding
If a reviewer asks you to move the starting material earlier in the synthesis, read that as a rejection of your original choice, because that is what it is.
Two consequences follow. Under the drug registration rules, a change during review that may affect safety, efficacy, or quality controllability counts as a major change: withdraw the application, finish the additional work, refile. And the manufacturing after the extension has to be done by the applicant. Outsourcing the newly included steps is not an option.
The penalty for getting this wrong used to be a deficiency letter. As of May 2026 it is a rejection.
A second finding shows how far this can spiral. During the response period, the applicant’s starting material process changed: the extended route no longer matched what was originally filed, several purification steps had been added, and the impurity profiles of the starting material and downstream intermediates before and after the change differed significantly. There was no systematic study of the change, and no validation at commercial scale. Nothing in the submission could support an evaluation of product quality.
There is something almost predictable about that failure. A team under time pressure fixes the immediate objection, changes the route, and treats the chemistry as settled. The comparison data never gets generated because nobody planned for it.
2. Impurities in starting materials and intermediates
Start with the starting material manufacturer’s process and work out what could be there: residual reagents, intermediates, by-products. Then narrow to two groups. Impurities that can participate in the next reaction, and impurities you actually detect. Where needed, control the impurity or its downstream transformation product in a later intermediate or in the API.
For intermediates, the control strategy has to be argued in context: the API process, what the starting material brings in and what those impurities become, and the API impurity profile. The emphasis lands in the same place, on anything that can keep reacting.
Here is what reviewers keep writing up:
- Measured results are low across every batch, so the limits get set wide, and the width has no basis behind it.
- No related substances test in the specification.
- Impurities structurally similar to the starting material or intermediate, and therefore able to keep reacting, are controlled neither as the parent nor as their transformation products.
- Several batches show a sizeable impurity at the same retention time, nobody identified it, and the only testing done used the downstream intermediate’s method. Nothing shows whether the process removes the impurity or converts it into something else.
That last one catches people out. An unidentified peak at the same retention time across multiple batches is a signal, not noise. Running a downstream method, seeing no peak, and calling it purged is not a purge study. You need identification, or you need data showing where the impurity went.
3. Solvent recovery: a cheap way to lose an application
Recovering solvent saves money and quietly imports risk. The study starts by asking what the reuse could bring in: solvent-related impurities, and impurities from the reaction step where the solvent is used, as residue and as accumulation. The ones that deserve the most attention are the impurities nobody is watching, meaning those not controlled in the intermediate specification, because nothing downstream will catch them.
Three things follow:
- Write a strict specification for the recovered solvent and give a basis for every limit.
- If you must use recovered solvent, define the rules and the number of reuse cycles, and back them with study and validation data. Keeping reuse inside a single step is the recommended scope.
- Keep recovered solvent out of the final purification step of the API. Reviewers hold this line.
One more trigger that catches people: when the production process changes, solvents previously exempt from routine control need their control strategy re-evaluated. An exemption earned under one process does not carry over to the next.
4. Structure elucidation: boring until it ends the review
Nobody gets excited about structure work, and then it becomes the reason the file dies. The usual findings:
- Whether the sample tested was representative in the first place.
- Elemental analysis where measured and theoretical differ by around 0.3%, unexplained, not repeated, and not resolved by high-resolution MS.
- Thermal analysis missing entirely, or present for a single pilot batch.
- For APIs with water or solvent of crystallization, no interpretation of the TGA and DTA curves showing that the number of water or solvent molecules is right.
- Nothing in the package that demonstrates batch-to-batch consistency of the crystal form.
Thermal analysis should be one tool among several for polymorph characterization, backed by at least three commercial-scale batches and paired with powder diffraction. Batch-to-batch form consistency is tied to process robustness, and a process that is not robust will show up in the diffraction and thermal data before it shows up anywhere else.
Under long-standing technical review standards, structure studies that fail to cover the skeleton structure, configuration, crystal form, and water or solvent of crystallization according to the compound’s characteristics are grounds for rejection. Incomplete here means rejected, not supplemented.
5. Quality studies and specifications
Organic impurities
For a generic API, the specification comes out of the pharmacopoeial or other official standard, combined with the maximum daily dose from the reference label, with limits set against ICH Q3A, Q3C, Q3D, and M7.
Findings that recur:
- Multiple tests (residue on ignition, total impurities, water) with measured values that fail the revised specification. That is a specification written around a process you do not have.
- A supplement request asking for comprehensive study and control of specific impurities (peroxide impurities, isomer impurities, degradation impurities, residual solvents) that went unanswered, leaving quality controllability unproven.
- One impurity measured above the ICH Q3A qualification threshold with nothing in the file supporting the proposed limit.
Polymorph-related impurities
Polymorphs as impurities. One API had several forms: an anhydrate, a hemihydrate, a monohydrate. The form used in the product was the hemihydrate, and other forms below 5% did not affect absorption. The review expectation was a quantitative method of suitable sensitivity to examine the polymorphic impurity, and to write the form that affects absorption into the specification.
Forms generated by the process. Another API’s process could produce Form I, a metastable form, and amorphous material. The expectation was attention to batch-to-batch consistency and stability of whatever form the filed process actually makes, characterization by DSC and X-ray diffraction across process, quality, and stability studies, and extra in-process or endpoint controls once the results were in.
Residual solvents
Residual solvents are studied under ICH Q3C and the relevant technical guidance, and the limits have to meet ICH Q3C. Specific points:
- Solvents without adequate toxicological data. Do not calculate a PDE yourself from literature values. Follow the impurity control principles in ICH Q3A or ICH Q3B, and where alerting structures are present, ICH M7 too.
- Daily dose above 10 g. If the actual maximum daily dose of the product exceeds 10 g, the limits need adjusting using the PDE and the actual daily dose.
- Class 1 solvents. These should not be used in API manufacture. Where a drug with significant therapeutic advantage genuinely cannot be made without one, the use needs a documented evaluation behind it. Any Class 1 solvent involved in the process has to be studied and controlled, whether it is there as solvent, as a starting material, as a by-product, or because it came from another solvent.
- Benzene. Several common solvents can introduce it: acetone, toluene, ethanol, methanol, isopropanol, xylene, hexane, petroleum ether.
Nitrosamines
Studied under ICH M7(R2) and its Q&A document, plus the technical guidance on nitrosamine impurities in chemical drugs. Where a potential process impurity contains a secondary amine group, the nitrosamines to consider include NDMA, NDEA, N-nitroso-N-methyl-4-aminobutyric acid (NMBA), N-nitrosodibutylamine (NDBA), and nitrosamine drug-substance-related impurities (NDSRIs).
The approach reviewers expect is a documented risk assessment informed by published requirements and nitrosamine listings from regulators such as FDA and EMA. On the back of that assessment, potential nitrosamines get synthesized deliberately and studied with high-sensitivity methods. Watch method robustness, especially during method transfer, because a method that only works in the originating laboratory is not a control strategy. Combine the assessment with multi-batch data including stability results, set the control strategy from that, and where it is warranted, write the limit into the registration specification and arrange confirmatory testing.
For acceptable intakes, EMA publishes an appendix that gets updated now and then, and FDA publishes its own table of recommended limits.
Elemental impurities
Two categories need assessing: elements intentionally added during manufacture of the API and its starting materials, and elements that may be present without anyone adding them.
Where several routes of administration are involved, assess the highest-risk case, accounting for route, maximum daily dose, and treatment duration. Limits then come from ICH Q3D using the maximum daily dose for that highest-risk scenario.
| Elemental impurity topic | Expectation |
| Analytical method | ICP-MS or ICP-OES, with full method validation |
| Batches | At least 3 consecutive commercial-representative batches, or 6 consecutive representative pilot-scale batches; more for mineral-derived APIs |
| Result above the limit | Reduce the level by optimizing the process |
| Result above 30% of the limit | Control it in the API specification |
| Intentionally added in the last step | Control in the specification, unless consistently cleared below 30% of the limit across 3 commercial or 6 pilot batches; even then, add in-process control or a release specification |
For limits going into the specification, follow ICH Q3D principles and make sure the limit reflects what the process can actually hold. Where an element could affect other quality attributes, catalysis in the API being the obvious one, set a tighter limit and justify it.
6. Stability
The most common finding in this section is almost disappointingly simple: the conditions chosen for the accelerated and long-term studies do not make sense.
Design them properly. Look at what stability information already exists, pharmacopoeial standards and published review reports included, then set the accelerated and long-term conditions against ICH Q1 and the applicable stability guidance. Storage statements follow the relevant labeling guidance and the general notices of the current pharmacopoeia.
7. Two administrative details that sink filings
Route of administration. The API registration form asks for the intended route of the finished product: injection, inhalation, ophthalmic, topical/sublingual, transdermal, oral, or other. Pick “other” and you have to explain why and state the actual route. Two findings come up repeatedly: the data do not support the route chosen, and the API is only intended for an oral product while the filing declares oral and injection both.
Complex APIs. These should be filed in association with the drug product rather than on their own. An API counts as complex when it is multi-component and compositionally messy, whether from biological sources (animal or plant extracts, urine-derived extracts such as citrus flavonoids or ulinastatin) or non-biological ones (icodextrin, iron sucrose, ferric carboxymaltose); when the process is complicated, control is hard, and the risk is high; or when demonstrating equivalence with the API used in the reference product through pharmaceutical studies alone is genuinely difficult.
Pre-submission self-audit
- Have you written out each ICH Q11 principle for your proposed starting material and weighed all of them together?
- Does the starting material specification include a related substances test, with limits you can defend?
- Is the starting material manufacturer’s process documented well enough to support your impurity analysis?
- Have you identified every impurity that can carry into the next reaction, transformation products included?
- Is every unidentified peak appearing at the same retention time across batches identified, or explained with real purge data?
- Do you have a recovered-solvent specification, defined reuse cycles, and validation data? Is recovered solvent kept out of the final purification?
- Does your elemental analysis match theory, or have you explained the gap?
- Do you have thermal and diffraction data from at least three commercial-scale batches?
- Have you rechecked impurity limits against the current reference label, dosing and treatment duration included?
- Is your elemental impurity package 3 commercial or 6 pilot batches, and have you applied the 30% rule?
- Do your accelerated and long-term conditions match ICH Q1 and what is already published for the compound?
- Does the declared route of administration match the data you actually hold?
- If the API is complex, is it being filed with the product?
FAQ
What makes a starting material acceptable under ICH Q11? A justification that works through the principles one at a time and weighs them together: enough steps between the material and the API to purge impurities, a well-defined stable compound of known structure, genuine commercial availability, a characterizable impurity profile, and demonstrable control of everything downstream.
Is one-step purification of a purchased crude API ever acceptable? Only when the API is an inorganic compound such as magnesium sulfate or sodium sulfate. Otherwise, a one-step purification submitted without the crude material’s full process and control documentation will not be accepted.
When is one-step salt formation acceptable? When the marketed free acid or base is itself an approved API.
What happens if the starting material is judged non-compliant with ICH Q11? As of May 2026, that is a major deficiency: no supplement request, straight to rejection. If the route has to be extended, that counts as a major change, so withdraw, finish the work, refile, and run the extended manufacturing yourself.
Can recovered solvent be used in the final purification step? No. Define reuse rules and cycle limits with validation data, keep reuse within the step, and leave recovered solvent out of the final purification of the API.
How many batches are needed for elemental impurity data? At least three consecutive commercial-representative batches, or six consecutive representative pilot-scale batches. Mineral-derived APIs should include more.
What is the 30% rule for elemental impurities? If measured levels exceed 30% of the acceptable concentration limit, control the element in the API specification. If levels stay below 30% across the required batches, specification control may not be needed, though in-process control or a release specification is still advisable.
Which solvents can introduce benzene? Acetone, toluene, ethanol, methanol, isopropanol, xylene, hexane, and petroleum ether.
Should a complex API be filed on its own? No. File it in association with the drug product.
How should storage conditions be worded? Follow the guidance on pharmaceutical information in package inserts and labeling, plus the general notices of the current pharmacopoeia.
Bottom line
Six things worth carrying into the next program:
- Starting material: judge it against the ICH Q11 principles as a set. Get it wrong and there is no supplement request.
- Impurities: analyze comprehensively, quantify specifically, justify every limit.
- Quality control: set limits against ICH Q3A, Q3C, Q3D, and M7.
- Elemental impurities: the 30% line. Above it goes in the specification, below it you may have room.
- Stability: sound conditions, properly worded storage statements.
- Complex APIs: file them with the product.
Requirements will keep moving. Files get through when the team asked these questions before submission instead of after.
General information and professional exchange. Requirements change and cases differ, so check anything here against current guidance and your own program before relying on it.

Comments are closed